DeVry NETW 360 NETW/360 NETW360 Week 6 Course PROJECT Part 2

$14.99

Category: Tags: ,

Description

NETW 360 NETW360 Week 6 Course PROJECT Part 2 Solution

Using a Predictive Site Survey Tool

 

Task 1 (5 points)Screenshot of the first floor (i.e., Floor1), showing concrete walls, dry wall, and elevator shafts defined/marked by using the Draw Wall feature.

 Task 2 (5 points)Screenshot of the RSSI diagram for the first floor (i.e., Floor1), showing AP placement (manual or automatic) in the 2.4 GHz band.

Task 3 (5 points): Screenshot of the RSSI diagram for the second floor (i.e., Floor2), showing AP placement (automatic or manual) in the 5 GHz band.

Task 4 (5 points)Screenshot of AP placement on floor 1 and floor 2 together (from the MainBuilding perspective) in the 2.4 GHz band.

Task 5 (5 points): Screenshot of AP placement on floor 1 and floor 2 together (from the MainBuilding perspective) in the 5 GHz band.

Question 1 (5 points)Observe the channel numbers assigned to all the APs, in the 2.4 GHz and the 5 GHz bands, respectively. Are the channel numbers consecutive in each case? Why or why not?

Task 6 (5 points)Submit the PDF report (along with the lab report to Dropbox) generated in Step 17 of the NETW360.Project.Part2.Instructions file.

 

Task 7 (5 points)Troubleshooting experience and Conclusions